Untitled
Abstract: No abstract text available
Text: 16 15 14 13 12 11 I 10 a SYMBOL DEFINITION A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M MISSING SYMBOLS TOTAL NO OF INSPECTIONS REQUIRED LAST NO. USED r\ 7 7 NO MISSING
|
OCR Scan
|
PDF
|
29N002
090C06
20JN05
ENCL05ED
|
Untitled
Abstract: No abstract text available
Text: 24 23 21 22 19 20 17 IB 16 15 14 12 13 10 11 7 8 7E SYMBOL D E F I N I T I O N M IS S IN G SYMBOLS A D IM ENSIO N WITHOUT AN IN S P E C T IO N REPORT SYMBOL C D OR < D DOES NOT R EQ U IR E IN S P E C T IO N . IT MAY BE CONTROLLED ON THE IN D IV ID U A L COMPONENT DRAWING.
|
OCR Scan
|
PDF
|
12AP02
04SE02
24JN03
14AP04
16AP04
06MY04
17DE02
1543537TURE
09-Jan-08
|
Untitled
Abstract: No abstract text available
Text: 24 23 22 21 19 20 18 17 16 15 14 13 11 12 7 8 10 SYMBOL DEFINITION MISSING SYMBOLS TOTAL NO OF INSPECTIONS REQUIRED A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M
|
OCR Scan
|
PDF
|
18DE03
|