AED05020-100
Abstract: No abstract text available
Text: 24 23 21 22 19 20 17 IB 16 15 14 11 12 13 7L 10 7 8 SYMBOL D E F I N I T I O N M IS S IN G SYMBOLS A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M TOTAL NO OF INSPECTIONS
|
OCR Scan
|
PDF
|
AED05020-100
AED05020-100
|
PPA-GF15
Abstract: No abstract text available
Text: 24 23 21 22 20 19 17 IB 16 15 14 12 13 10 11 7Z 7 8 SYMBOL D E F I N I T I O N M IS S IN G A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M TOTAL NO OF INSPECTIONS
|
OCR Scan
|
PDF
|
01JN07
19JN07
27-Jun-07
PBT-GF20<
PPA-GF15
|
PPA-GF15
Abstract: No abstract text available
Text: 24 23 22 21 20 19 17 IB 16 15 14 12 13 10 11 V 8 7 SYMBOL DEFINITION A DIMENSION WITHOUT AN INSPECTION REPORT SYMBOL DOES NOT REQUIRE INSPECTION. IT MAY BE CONTROLLED ON THE INDIVIDUAL COMPONENT DRAWING. M MISSING SYMBOLS TOTAL NO OF INSPECTIONS REQUIRED
|
OCR Scan
|
PDF
|
28AP06
04SE06
17N006
19JN07
25-Jan-08
PPA-GF15
|