Please enter a valid full or partial manufacturer part number with a minimum of 3 letters or numbers

    INSPECTION SAMPLING PLAN Search Results

    INSPECTION SAMPLING PLAN Result Highlights (5)

    Part ECAD Model Manufacturer Description Download Buy
    C308 Coilcraft Inc Designer's Kit, Micro Springs, 5% tol, RoHS Visit Coilcraft Inc Buy
    C318-2 Coilcraft Inc Designer's Kit, Midi Springs, 2% tol, RoHS Visit Coilcraft Inc Buy
    C324B Coilcraft Inc Designer's Kit, 0603CS chip inductors, 5% tol, RoHS Visit Coilcraft Inc Buy
    C331 Coilcraft Inc Designer's Kit, DO1813H power inductors, RoHS Visit Coilcraft Inc Buy
    C341 Coilcraft Inc Designer's Kit, 1008PS power inductors, RoHS Visit Coilcraft Inc Buy

    INSPECTION SAMPLING PLAN Datasheets Context Search

    Catalog Datasheet MFG & Type PDF Document Tags

    Z9015-1

    Abstract: RAW MATERIAL INSPECTION procedure Z8115
    Text: [ 6 ] Appendix Contents 1. Sampling Inspection . 1 1.1 Sampling Inspection . 1 1.2 1.3 Sampling Inspection Methods . 1


    Original
    PDF Z8115 MIL-HDBK-217F Z9015-1 RAW MATERIAL INSPECTION procedure Z8115

    Untitled

    Abstract: No abstract text available
    Text: MIL-STD-1553 TRANSFORMERS QPL Interface Transformers Overview MIL-PRF-21038/27 Inspection, Sampling, Testing Table 1 — Group A Inspection Level “C”* Level “M” Level “T” Tests Sampling Plan Tests Sampling Plan Tests Sampling Plan N/A N/A Electrical Characteristics


    Original
    PDF MIL-STD-1553 MIL-PRF-21038/27 MIL-PRF-21038/27 MIL-PRF-21038 MC118

    Untitled

    Abstract: No abstract text available
    Text: back to “Contents” PULSE SPECIALTY COMPONENTS MIL-PRF-21038/27 Inspection, Sampling, Testing Table 1: Group A Inspection Level "C" * Tests Level " M" S ampling Plan Level " T" Tests S ampling Plan Tests Sampling Plan NA Electrical Characteristics per


    Original
    PDF MIL-PRF-21038/27 MIL-PRF-21038/27 MIL-PRF-21038

    LA 7340

    Abstract: SAE j 726 aol nby ITT LMT N 413 af 321 tlt 149 GS 393s CCT-D LTWF
    Text: NOT MEASUREMENT MVF MIL-STO-1D5E 10 MAY 1989 SUPERSEDING MIL-STD-1D5D 29 APRIL 1963 MILITARY’ STANDARD SAMPLING PROCEDURES AND TABLES FOR INSPECTION BY AITRIBUTES I AMSC ~~. N/A AREA Approved for public releese; dlstrlbutlon is QCIC unlimited. MIL-STO-1O5E


    Original
    PDF SN-lPL13K LA 7340 SAE j 726 aol nby ITT LMT N 413 af 321 tlt 149 GS 393s CCT-D LTWF

    Untitled

    Abstract: No abstract text available
    Text: Glossary Vishay Foil Resistors Bulk Metal Foil Technology Glossary of Terms ACCEPTABLE QUALITY LEVEL AQL : The maximum percent defective (or maximum number of defects per hundred units) that, for the purpose of sampling inspection, can be considered satisfactory as a process average. Defects may be


    Original
    PDF

    INCOMING RAW MATERIAL INSPECTION procedure

    Abstract: INCOMING MATERIAL INSPECTION procedure MATERIAL INSPECTION procedure aql incoming inspection
    Text: Quality Details Quality Details 2 Quality Details 2.1 Quality Assurance For our small-signal semiconductor division supplying Quality means satisfying our customers’ present and future expectations. Our strategic goal is the zero-defect principle, which we have largely achieved by a


    Original
    PDF EHA07240 INCOMING RAW MATERIAL INSPECTION procedure INCOMING MATERIAL INSPECTION procedure MATERIAL INSPECTION procedure aql incoming inspection

    INCOMING RAW MATERIAL INSPECTION procedure

    Abstract: INCOMING MATERIAL INSPECTION procedure inspection sampling plan
    Text: Quality Assurance 1 General The high demands the world market places on the quality of products and services to be supplied by us make a thorough, comprehensive and modern quality assurance and management system QM indispensable. The quality assurance system enforced in the Capacitors Division has been


    Original
    PDF

    siemens spc 2

    Abstract: aql incoming inspection siemens spc-2
    Text: Quality 1 Typical production sequence / inspection plan Supplied parts Coil formers, cores Incoming inspection Automatic winding Check of machine settings Visual inspection Soldering / tinning Check of, soldering temperature, flux and soldering time Visual inspection of appearance


    Original
    PDF

    ISO STANDARDS SHEET METAL THINNING

    Abstract: MIL-STD-883H Ultrasonic Cleaning Transducer IPC-4101-92 MIL-T-27730 SEM 2006 IPC-4101-95 AL wire bond spool color code ultrasonic transducer 150 khz ultrasonic proximity detector report file
    Text: MIL-STD-883H * METHOD 2018.5 SCANNING ELECTRON MICROSCOPE SEM INSPECTIONS 1. PURPOSE. This method provides a means of judging the quality and acceptability of device interconnect metallization on non-planar oxide integrated circuit wafers or dice. SEM inspection is not required on planar oxide interconnect


    Original
    PDF MIL-STD-883H ISO STANDARDS SHEET METAL THINNING MIL-STD-883H Ultrasonic Cleaning Transducer IPC-4101-92 MIL-T-27730 SEM 2006 IPC-4101-95 AL wire bond spool color code ultrasonic transducer 150 khz ultrasonic proximity detector report file

    Untitled

    Abstract: No abstract text available
    Text: Quality Specifications 1 General The high demands made of us by the world market for product and service quality make a comprehensive, thorough and up-to-date quality management system indispensable. The QM system introduced in Capacitors Division was certified to EN ISO 9001 in June 1992.


    Original
    PDF

    QFN-0601

    Abstract: No abstract text available
    Text: 管理計画 QFN-0601 CONTROL PLAN (QFN-0601) トレックス・セミコンダクター株式会社 TOREX SEMICONDUCTOR LTD. 代表例 工程記号 No. 工程名 Flow Process 1 ウエハ受入 ◇ Wafer incoming 2 酸化 ○ Oxide 3 酸化膜チェック


    Original
    PDF QFN-0601) QFN-0601

    USP-4D

    Abstract: No abstract text available
    Text: 管理計画 USP-4D CONTROL PLAN (USP-4D) トレックス・セミコンダクター株式会社 代表例 TOREX SEMICONDUCTOR LTD. 工程記号 No. 工程名 Flow Process 1 ウエハ受入 ◇ Wafer incoming 2 酸化 ○ Oxide 3 酸化膜チェック


    Original
    PDF

    USP-4

    Abstract: No abstract text available
    Text: 管理計画 USP-4 CONTROL PLAN (USP-4) トレックス・セミコンダクター株式会社 TOREX SEMICONDUCTOR LTD. 代表例 工程記号 No. 工程名 Flow Process 1 ウエハ受入 ◇ Wafer incoming 2 酸化 ○ Oxide 3 酸化膜チェック ◇


    Original
    PDF

    USP-6C

    Abstract: No abstract text available
    Text: 管理計画 USP-6C CONTROL PLAN (USP-6C) トレックス・セミコンダクター株式会社 代表例 TOREX SEMICONDUCTOR LTD. 工程記号 No. 工程名 Flow Process 1 ウエハ受入 ◇ Wafer incoming 2 酸化 ○ Oxide 3 酸化膜チェック


    Original
    PDF

    SOD-323A

    Abstract: No abstract text available
    Text: 管理計画 SOD-323A CONTROL PLAN (SOD-323A) トレックスセミコンダクター株式会社 代表例 TOREX SEMICONDUCTOR LTD. 工程記号 No. 工程名 Flow Process 1 ウエハ受入 ◇ Wafer incoming 2 酸化 ○ Oxide 3 酸化膜チェック


    Original
    PDF OD-323A) SOD-323A

    INCOMING RAW MATERIAL INSPECTION procedure

    Abstract: circuit diagram of QS 8005
    Text: Quality Assurance 1 General The quality of our products and services is an essential part of our corporate strategy the prime objective being maximum benefit to our customers world-wide. The high demand we fulfill by consistent application of – a Quality Management System which is always in line with the most stringent international standards,


    Original
    PDF

    USP-3

    Abstract: No abstract text available
    Text: 管理計画 USP-3 CONTROL PLAN (USP-3) トレックス・セミコンダクター株式会社 代表例 TOREX SEMICONDUCTOR LTD. 工程記号 No. 工程名 Flow Process 1 ウエハ受入 ◇ Wafer incoming 2 酸化 ○ Oxide 3 酸化膜チェック ◇


    Original
    PDF

    SOD-723

    Abstract: No abstract text available
    Text: 管理計画 SOD-723 CONTROL PLAN (SOD-723) トレックスセミコンダクター株式会社 代表例 TOREX SEMICONDUCTOR LTD. 工程記号 No. 工程名 Flow Process 1 ウエハ受入 ◇ Wafer incoming 2 酸化 ○ Oxide 3 酸化膜チェック


    Original
    PDF OD-723) SOD-723

    Untitled

    Abstract: No abstract text available
    Text: 管理計画 SMA CONTROL PLAN (SMA) トレックス・セミコンダクター株式会社 TOREX SEMICONDUCTOR LTD. 代表例 工程記号 No. 工程名 Flow Process 1 ウエハ受入 ◇ Wafer incoming 2 酸化 ○ Oxide 3 酸化膜チェック ◇ Oxide check


    Original
    PDF

    USP-10

    Abstract: No abstract text available
    Text: 管理計画 USP-10 CONTROL PLAN (USP-10) トレックス・セミコンダクター株式会社 代表例 TOREX SEMICONDUCTOR LTD. 工程記号 No. 工程名 Flow Process 1 ウエハ受入 ◇ Wafer incoming 2 酸化 ○ Oxide 3 酸化膜チェック


    Original
    PDF USP-10) USP-10

    QFN-24

    Abstract: No abstract text available
    Text: 管理計画 QFN-24 CONTROL PLAN (QFN-24) トレックス・セミコンダクター株式会社 TOREX SEMICONDUCTOR LTD. 代表例 工程記号 No. 工程名 Flow Process 1 ウエハ受入 ◇ Wafer incoming 2 酸化 ○ Oxide 3 酸化膜チェック


    Original
    PDF QFN-24) QFN-24

    USP-12B01

    Abstract: No abstract text available
    Text: 管理計画 USP-12B01 CONTROL PLAN (USP-12B01) トレックス・セミコンダクター株式会社 代表例 TOREX SEMICONDUCTOR LTD. 工程記号 No. 工程名 Flow Process 1 ウエハ受入 ◇ Wafer incoming 2 酸化 ○ Oxide 3 酸化膜チェック


    Original
    PDF USP-12B01) USP-12B01

    SOD-523

    Abstract: No abstract text available
    Text: 管理計画 SOD-523 CONTROL PLAN (SOD-523) トレックス・セミコンダクター株式会社 代表例 TOREX SEMICONDUCTOR LTD. 工程記号 No. 工程名 Flow Process 1 ウエハ受入 ◇ Wafer incoming 2 酸化 ○ Oxide 3 酸化膜チェック


    Original
    PDF OD-523) SOD-523

    Y parameters of transistors

    Abstract: SAMPLING PLAN
    Text: Philips Semiconductors Product specification Microwave Transistors General BATCH RELEASE TESTS FOR GRADE “X” AND "Y” EQUIVALENTS Group B; note 1. INSPECTIONS MIL STD 750 METHOD CONDITIONS SAMPLING PLAN LTPD<2> SMALL LOT QUALITY CONFORMANCE INSPECTION


    OCR Scan
    PDF